10

2025

-

01

The correct installation method of the broken hammer pipeline

When it comes to the broken hammer, everyone must know that it is the tool used in the excavation project.


When it comes to the broken hammer, everyone must know that it is the tool used in the excavation project. It is usually visible in the construction of the highway. The pipeline of the broken hammer is one of the parts that need to be paid attention to in the intact work of the broken hammer. Regarding its use and maintenance issues, it has been deeply concerned by everyone. Therefore.Xiaobian has compiled a few points for you to share with you the common methods of installing the broken hammer pipeline. The specific operations are as follows:
The pipeline for installing the breaker is first a two-wire supervisor and branch pipe: from the lubrication pump to the oil inlet of all distributors, the pressure is relatively high.Usually cold-drawn seamless steel pipes are used, and the material is No. 10 or No. 15 steel.Do not use badly rusted pipes;
Secondly, the pipeline of the broken hammer should be supplied to the oil pipe: from the distributor to the oil inlet (bearing seat oil hole) of all lubrication points, the pressure is relatively low.Usually drawn copper pipes are used to facilitate piping when bending.There are also cold-drawn seamless steel pipes or stainless steel pipes;
If a hose joint is used when connecting the movable parts, there are many accessories for the broken hammer. Not only must the method be correct in use, but also pay attention to the usual maintenance and maintenance work.

%{tishi_zhanwei}%

Note: Please leave your contact information, our professionals will contact you as soon as possible!

SUBMIT